Berkeley Residence ( New Residential Construction and Solar panel Installation : Design/Build )

Design/Build of a two story residence in Berkeley and also includes the design and construction of deck,detached garage, landscaping and installation of solar panels.

DWR Showroom - 4th street, Berkeley ( Commercial Building Remodel and Seismic Retrofit : Design/Build) 

Remodel work of an existing commercial showroom. This project  included creating large openings on an existing structural concrete block wall and shotcreting etc,in order to expand the showroom space. 

Napa Valley Residence  (Seismic Retrofit : Design/Build)

Seismic Retrofit of a single story Napa Valley residence after the 2014 Napa Valley Earthquake.

Berkeley Residence (New Deck : Design/Build )

Design/Build of a new wood deck.

Berkeley Residence ( Soft story retrofit : Design/Build  )

Design /Build of Cantilevered Column : Seismic retrofit of the garage opening. 

San Francisco Residence  ( Retrofit of masonry foundation : Design/Build  )

This project involved construction of concrete foundation wall and attaching to the existing masonry foundation.

San Leandro Apartments ( Retrofit  of  100 ft Garage and stairways : Design/Build )

This project involved installation and design of 14" deep beam along 100 ft long garage, shotcreting the concrete wall, transverse shearwalls , retrofitting existing stairways etc).

Amtrak Station Building, Oakland  ( Pre Fabricated Structure : Design/Build  )

This structure was prefabricated at our facility  and erected on site at AMTRAK. 

 Larkspur Ferry Inspection Facility  (Design Build ) 

A Homeland Security inspection facility for the Golden Gate Bridge Highway and Transportation District  was engineered and constructed by our team. The project also included hazardous materials removal, construction debris pollution control, drainage study and design, and new public space with landscape structures.

 Crowden School,Berkeley (Structural Restoration : Design Build)

A design-build project providing seismc reinforcement to the Crowden School. This project also included site grading and design and installation of the drainage system. The athletic field was also designed and constructed.

Alameda Apartments (Soft story seismic retrofit : Design Build)

Installation and design of Moment Frame.